Stop Running Your Press Floor on Whiteboards. Start Running It on Data.
Every minute of unplanned press downtime costs money. Every makeready that runs long because a job was sequenced wrong costs more. Seradex ERP replaces manual scheduling boards and gut-feel planning with a data-driven scheduling engine built for multi-press operations - Flexo, Litho, Digital, and Silk Screen.
The Value of Sequencing Jobs for Uptime, Not Just Dates
Flexo and Litho assets carry thousands of dollars per hour in fully loaded cost, yet many shops still schedule with whiteboards, spreadsheets, and daily meetings that are obsolete by lunch.
Seradex sequences work using press availability, priority, substrate changeover, colour optimization, and material readiness - and recalculates when reality changes.
Typical outcomes include reduced makeready through intelligent sequencing, higher press utilization by closing schedule gaps, improved on-time delivery from constraint-aware date commitment, and schedule replanning in minutes instead of hours.

Key Features: Built for Multi-Press Print Scheduling
Our ERP system offers advanced scheduling capabilities designed specifically for cabinet manufacturers:
Group by substrate to cut changeover, sequence colours light-to-dark to reduce wash-up, cluster common plate sets; Flexo can group by cylinder repeat to cut sleeve changes; Litho can sequence by grain and sheet size to cut feeder tweaks - more hours producing sellable work, fewer in makeready.
Supervisors see every press - running, makeready, maintenance, idle - with queued jobs, expected start and finish, and material readiness; multi-shift handoffs see the next shift's plan without whiteboards or phone tag.
Sales answers "when can I have it?" from current press load, priorities, material availability, and finishing capacity - including Digital rush work beside multi-day Litho.
Press availability, priority, substrate changeover, colour sequence, and material availability are evaluated before a job is placed.
Rush jobs and pulled jobs trigger immediate recalculation and show impact across the rest of the schedule.
See load by press across week, month, and quarter to commit delivery dates with evidence and to know when to add capacity.
Group jobs by repeat and sleeve diameter to reduce sleeve change and register setup time.
Sequence multi-colour Litho and Flexo to reduce wash-ups and ink waste between jobs.
Place planned maintenance on the calendar and auto-shift the queue so service does not become surprise delay.
Extend scheduling past the press to lamination, die-cutting, folding, stitching, and shipping so the chain stays coordinated.
Insert urgent work with automated impact analysis on which jobs move and by how much before you commit.
Compare scheduled versus actual time by job, operator, and press to refine benchmarks and costing standards.
Case Studies: Success in Action
Real Results for Printing Operations Like Yours
Case Study 1:
The press that waited on makeready
When sequencing ignores substrate and colour, makeready stretches and sellable hours disappear. Seradex applies the same grouping logic strong operators use - systematically - so the schedule protects uptime.
Case Study 2:
Scheduling KPIs
Shops report shorter makeready from better sequences, higher utilization from fewer idle gaps, on-time gains from capacity-backed promise dates, and faster what-if replans when rush work lands.
Case Study 3:
Rush at 9 AM, pull at 2 PM
The engine recalculates around real events and shows downstream impact immediately so planners commit changes with full visibility.
How this connects to Seradex modules
Frequently Asked Questions
Answers to common questions to help you better understand our solutions and processes.
Yes. Constraints include press availability, materials, colour and substrate change logic, and downstream finishing where configured.
Yes. Rush insertions and cancellations trigger recalculation with visible impact on other jobs.
The due date engine uses load, materials, and finishing capacity so committed dates are backed by current reality.
Yes. Maintenance windows sit on the calendar and the queue adjusts around them.
Yes. Scheduled versus actual comparisons are available by job, operator, and press.
Expert Tips for Production Managers

ARE YOU READY?
Get More From Every Hour Your Presses Run
Seradex ERP gives your production team the tools to schedule smarter, react faster, and deliver on time - every time. Book a demo and see what intelligent press scheduling looks like for your operation.